Piper Aircraft

From Repairs to Replacement—50+ Years of Trust.

How Mid-State’s long-term relationship with Piper led to a smart, timely system upgrade.

Piper Aircraft

Overview

Piper Aircraft had worked with Mid-State for decades, relying on their team for ongoing repairs and service of critical chillers and pumps. When the equipment reached end-of-life, they trusted Mid-State to guide the replacement.

Challenge

The aging system had undergone multiple repairs over the years, but replacing the chillers meant planning for zero downtime—and getting it done in a tight window.

Our Solution

Mid-State evaluated the system and timing, sourced water-cooled Trane chillers, and coordinated the install without impacting operations. Familiarity with the system allowed for a smoother, more confident upgrade.

Results

• Two chillers and corresponding pumps replaced • Long-term service partner with deep system knowledge • Timely upgrade prevented forced emergency replacement

Location: Indian River County

Sector: Aerospace / Manufacturing

Posted Date | September 5, 2025

Piper Aircraft Piper Aircraft Piper Aircraft Piper Aircraft

Related Posts

West Melbourne School for Science

West Melbourne School for Science

How Mid-State installed a new Trane air-cooled chiller, underground piping, and custom ductwork to serve the school’s 16,000 sq. ft. expansion

Read More
Quest Elementary School

Quest Elementary School

How Mid-State replaced an aging ice tank cooling system with new Carrier air-cooled chillers to improve reliability for a 125,000 sq. ft. school.

Read More
Creative Arts Academy of Saint Lucie

Creative Arts Academy of Saint Lucie

How Mid-State delivered a complete HVAC system to support a new cafeteria and auditorium for the Creative Arts Academy of St. Lucie.

Read More